Mayville Engineering Named Top Fabricator

Mayville Engineering Company (MEC) has been named first on the FAB 40 list of the nation’s largest fabricators which is published by The Fabricator magazine. It is the seventh consecutive year that MEC has led the list. MEC Chairman, President and CEO Robert Kamphuis says he’s proud of the MEC team that has made this possible. The company has extensive operations in Wisconsin with manufacturing facilities in Mayville, Beaver Dam, Neillsville and Wautoma. MEC operates 16 manufacturing facilities in five states.

Read More.